Field,drainage,tile,plow,laser,trailers,irrigation,farm,plastic tubing,rolloffs,tilepro,tiling attachment,Waynes Welding,field drainage,rolloff box,tile plow,laser grade,drainage tile, power feeder, power, feeder

It Pays for Itself
When You Tile
Tile Pro Page Roll Off Boxes Page Bulk Oil Page Contact Info Page About Wayne's Inc.
tile pro info
tile pro specs
power feeder
stringer trailer
laser systems
Links
Cost Comparison

At 1 MPH = 88 Ft. per min

Average cost of Tiling per foot .50 cents per foot 88 ft X .50 = $44.00 per min.

$44.00 X 60 minutes = $2,640.00 Savings Per Hr.

Pay for $14,500.00 Plow in 5.5 hrs.

Pay for $23,355.00 Plow and Laser in 8.85 hrs.

Comparison Table
Click here for Word Document

 

 
Wayne Weber, owner
PO Box 187 MORGAN, MN 56266
Phone: 507-249-3176
Fax: 507-249-3146
 Contact Page | Bulk Oil | Roll Off Boxes | Tile Pro Home | Tile Pro Info | Tile Pro Specs 1 | Tile Pro Specs 2 | Power Feeder | Stringer Trailer | Laser Plane | Links | About Us
This site maintained by
Web Design and Computer Applications